HAE
Portfolio · Established 1955

Our

projects

Seven decades of first-grade engineering across every discipline in Jordan.

118
Projects Completed
Published portfolio
17
Featured Highlights
Curated selection
70+
Years Active
Since 1955
7+
Project Types
Across Jordan
Featured Work

Key
Projects

Landmark projects spanning Jordan's most demanding engineering disciplines — seven decades of excellence.

17 Projects
Hover a project
Location
Year
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan Buildings 2024
Tal Al Rumman · 2024
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan
Husseini Mosque Renovation Buildings 2024
Amman · 2024
Husseini Mosque Renovation
The Construction of HLP Dewatering Unit Industrial 2023
Ghour Safi · 2023
The Construction of HLP Dewatering Unit
Water 2023
Zara Maen · 2023
Rehabilitation of Zara Ma'in Water System Post RO Treatment Bypass Facilities
Expansion and Renovation of Bank ABC (Jordan) headquarters Project Package No.3 Main Building Works Buildings 2023
Amman · 2023
Expansion and Renovation of Bank ABC (Jordan) headquarters Project Package No.3 Main Building Works
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1 Industrial 2022
Aqaba · 2022
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1
Construction of Tafileh Wastewater Treatment Plant Water 2022
Tafileh · 2022
Construction of Tafileh Wastewater Treatment Plant
Electromechanical 2021
Jordan · 2021
Roll-out projects for the Energy Efficiency in public Buildings in Jordan _EEPB Ministry of Public Works and Housing
Design, Construction & Commissioning of  Supervisory Control and Data Acquisition (SCADA) System  For Amman and Madaba FARA 9 Electromechanical 2021
Amman and Madab · 2021
Design, Construction & Commissioning of Supervisory Control and Data Acquisition (SCADA) System For Amman and Madaba FARA 9
Construction of Amman Bus Rapid Transit (BRT) Project - Package 8 and 9B (Omar Matar Street) and Package 9A (Fountain Square Terminal Station) Roads, Bridges & Tunnels 2021
Amman · 2021
Construction of Amman Bus Rapid Transit (BRT) Project - Package 8 and 9B (Omar Matar Street) and Package 9A (Fountain Square Terminal Station)
Saraya Aqaba – Zone R1 Buildings 2019
Aqaba · 2019
Saraya Aqaba – Zone R1
Construction of East Jerash Wastewater Treatment Plant Water 2018
Jarash · 2018
Construction of East Jerash Wastewater Treatment Plant
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1 Water 2016
Irbid · 2016
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1
Samarah Dead Sea Project Villas, Mall, Swimming Pool & Drainage Buildings 2013
Dead Sea · 2013
Samarah Dead Sea Project Villas, Mall, Swimming Pool & Drainage
Marsa Zayed Phase1 Development Project Infrastructure 2013
Aqaba · 2013
Marsa Zayed Phase1 Development Project
Shmeissani – Abdali Interchange Roads, Bridges & Tunnels 2012
Amman · 2012
Shmeissani – Abdali Interchange
Infrastructure 1999
Amman · 1999
Infrastructure of Abu-Nusair Housing Project
Active Work

Ongoing
Projects

8 Projects
Water
Design, Build and Operate of the Northeast Balqa WWTP
AL-Balqa
Water
Construction of bani Kenanah Water Supply System - Package A
Irbid
Water
C2 – Strengthening and restructuring of the Ramtha City and suburbs water distribution networks
Ramtha
Water
Smart Utility Transformation Project
Jordan
Water
Construction of Ramtha Wastewater Treatment Plant Expansion
Ramtha
Water
Dair Alla & Karamah Water Supply System Project-Package 5
Al-Karameh
Water
Rehabilitation and Operation of Abu Ezzighan RO Water Desalinaton Plant
Al-Karameh
Complete Portfolio

All
Projects

44 Projects

No projects match your search.

Hallabat Well Field Transmission Pipeline Water
Hallabat Well Field Transmission Pipeline
Zarqa 2024
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan Buildings
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan
Tal Al Rumman 2024
Husseini Mosque Renovation Buildings
Husseini Mosque Renovation
Amman 2024
The Construction of HLP Dewatering Unit Industrial
The Construction of HLP Dewatering Unit
Ghour Safi 2023
Expansion and Renovation of Bank ABC (Jordan) headquarters Project Package No.3 Main Building Works Buildings
Expansion and Renovation of Bank ABC (Jordan) headquarters Project Package No.3 Main Building Works
Amman 2023
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1 Industrial
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1
Aqaba 2022
Construction of Tafileh Wastewater Treatment Plant Water
Construction of Tafileh Wastewater Treatment Plant
Tafileh 2022
Design, Construction & Commissioning of  Supervisory Control and Data Acquisition (SCADA) System  For Amman and Madaba FARA 9 Electromechanical
Design, Construction & Commissioning of Supervisory Control and Data Acquisition (SCADA) System For Amman and Madaba FARA 9
Amman and Madab 2021
Construction of Amman Bus Rapid Transit (BRT) Project - Package 8 and 9B (Omar Matar Street) and Package 9A (Fountain Square Terminal Station) Roads, Bridges & Tunnels
Construction of Amman Bus Rapid Transit (BRT) Project - Package 8 and 9B (Omar Matar Street) and Package 9A (Fountain Square Terminal Station)
Amman 2021
Construction of an administrative and logistical hub in El Ruweishid, Jordan Buildings
Construction of an administrative and logistical hub in El Ruweishid, Jordan
El Ruweished 2021
Rehabilitation work of the old internal building in Al-Bashir Hospitals and its development as an intensive care building Buildings
Rehabilitation work of the old internal building in Al-Bashir Hospitals and its development as an intensive care building
Amman 2020
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P1 Water
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P1
Jordan 2019
Pilots Project for Energy Efficiency in Public Buildings in Jordan – EEPB Electromechanical
Pilots Project for Energy Efficiency in Public Buildings in Jordan – EEPB
Jordan 2019
Saraya Aqaba – Zone R1 Buildings
Saraya Aqaba – Zone R1
Aqaba 2019
Extension & Rehabilitation of Wastewater Collection System in Mafraq City Water
Extension & Rehabilitation of Wastewater Collection System in Mafraq City
Mafraq 2019
Construction of East Jerash Wastewater Treatment Plant Water
Construction of East Jerash Wastewater Treatment Plant
Jarash 2018
Construction Site for JTAC Simulator in Jordan Buildings
Construction Site for JTAC Simulator in Jordan
Zarqa 2017
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1 Water
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1
Irbid 2016
Contract 6: Construction of Basateen Pump Station and Reservoir Water
Contract 6: Construction of Basateen Pump Station and Reservoir
Basateen 2016
Package (1) Design, Construction and Commissioning of Um Elulu- Jerash and Hofa-Ajloun System Facilities Water
Package (1) Design, Construction and Commissioning of Um Elulu- Jerash and Hofa-Ajloun System Facilities
Jerash & Ajloun 2016
Samarah Dead Sea Project Villas, Mall, Swimming Pool & Drainage Buildings
Samarah Dead Sea Project Villas, Mall, Swimming Pool & Drainage
Dead Sea 2013
Marsa Zayed Phase1 Development Project Infrastructure
Marsa Zayed Phase1 Development Project
Aqaba 2013
Galleria  Mall –Electromechanical Works Electromechanical
Galleria Mall –Electromechanical Works
Amman 2013
Samara Resorts Dead Sea / Buildings D, E & F and Landscape Works Buildings
Samara Resorts Dead Sea / Buildings D, E & F and Landscape Works
Dead Sea 2012
Al Dirreh Land Borders Crossing Roads Phase 1 Roads, Bridges & Tunnels
Al Dirreh Land Borders Crossing Roads Phase 1
Aqaba 2012
Shmeissani – Abdali Interchange Roads, Bridges & Tunnels
Shmeissani – Abdali Interchange
Amman 2012
Water Supply System in Humaemeh Water
Water Supply System in Humaemeh
Aqaba 2010
Irbid Wastewater & Pump Station for Natifa & Docarah Water
Irbid Wastewater & Pump Station for Natifa & Docarah
Irbid 2008
Tawfeeq Al-Tabba’ & Al-Shoura Interchange Roads, Bridges & Tunnels
Tawfeeq Al-Tabba’ & Al-Shoura Interchange
Amman 2007
Prince Ghazi Intersection Roads, Bridges & Tunnels
Prince Ghazi Intersection
Amman 2006
RH Prince Hamzeh Hospital Buildings
RH Prince Hamzeh Hospital
Amman 2004
Restructuring of Greater Amman Water Supply System - Contract 9 Water
Restructuring of Greater Amman Water Supply System - Contract 9
Amman 2003
Rehabilitation of Prophet Sho’ayb Shrine Buildings
Rehabilitation of Prophet Sho’ayb Shrine
Salt 2002
Construction of Ministry of Health General Stores & Work Shop Buildings
Construction of Ministry of Health General Stores & Work Shop
Zarqa 1999
Olympic Swimming Pool Buildings
Olympic Swimming Pool
Amman 1999
Construction of Urology Unit at Al-Hussein Medical City Buildings
Construction of Urology Unit at Al-Hussein Medical City
Amman 1999
Al-Shaheed Intersection Tunnel Roads, Bridges & Tunnels
Al-Shaheed Intersection Tunnel
Amman 1999
Rehabilitation of Tal Al- Thahab Weir Water
Rehabilitation of Tal Al- Thahab Weir
Irbid 1999
F 16 Facilities /Muafaq Salti Air Base Buildings
F 16 Facilities /Muafaq Salti Air Base
Mafraq 1998
Extension of Intercontinental Hotel Buildings
Extension of Intercontinental Hotel
Amman 1998
H.M. King Talal Intersection Twin Tunnel Roads, Bridges & Tunnels
H.M. King Talal Intersection Twin Tunnel
Amman 1997
Upgrading and Expansion of the Water System at Salt City Water
Upgrading and Expansion of the Water System at Salt City
Salt 1997
Faculty of Educational Science Buildings
Faculty of Educational Science
Amman 1995
Lib Pumping Station Water
Lib Pumping Station
1992
Complete portfolio

Additional entries

66 entries without photos

No additional entries match this filter.

Project Type Location Client Year Status
Upgrade Khaw Abu-Alanda phase (II) Water Amman Jordan Water Company (Miyahuna) 2026 Completed
Supply, Install, and Commission Pressure Management System Water Amman Jordan Water Company (Miyahuna) 2026 Completed
Upgrade Khaw Pump Station Water Zarqa Jordan Water Company (Miyahuna) 2026 Completed
SJFMEIAMC Healthcare and Educational Project – Package 02 – Enabling, Excavation and Skeleton Works. Buildings Amman Saudi Jordanian Fund for Medical and Educational Investments and Asset Management Company 2025 Completed
Complementary Work for Network Rehabilitation of As-Salt Downtown (Naqab Swada) Water Salt Ministry of Water & Irrigation - Water Authority of Jordan 2025 Completed
South Amman WWTP RAW Wastewater Storage Pond and Additional Diversion Chambers Works Water Amman Jordan Water Company (Miyahuna) 2024 Completed
Rehabilitation of Zara Ma'in Water System Post RO Treatment Bypass Facilities Water Zara Maen Ministry of Water & Irrigation - Water Authority of Jordan 2023 Completed
The Construction of HLP Stone Removal Unit Industrial Ghour Safi Arab Potash Company 2023 Completed
Driving Training Project Roads, Bridges & Tunnels Amman KASOTC 2023 Completed
Water Sector Infrastructure Project (WSIP) /Amman Improvement Phase III/ Package (2): Miscellaneous Water Networks in Amman Water Amman Ministry of Water & Irrigation - Water Authority of Jordan 2023 Completed
Supply and Installation of a 600 mm Steel Pipeline on Airport Road near Plaza Gas Station Water Amman Jordan Water Company (Miyahuna) 2022 Completed
Roll-out projects for the Energy Efficiency in public Buildings in Jordan _EEPB Ministry of Public Works and Housing Electromechanical Jordan Ministry of Public Works & Housing 2021 Completed
Restructuring & Rehabilitation of DZ-28, Water Supply Network Water Amman Jordan Water Company (Miyahuna) 2021 Completed
Restructuring & Rehabilitation of DZ-04, DZ-05, DZ-18, Water Supply Network Water Amman Jordan Water Company (Miyahuna) 2021 Completed
Bridge 4 Rehabilitation Works – Sweimwh – Zara Road /Dead Sea Roads, Bridges & Tunnels Dead Sea Ministry of Public Works & Housing 2020 Completed
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P2 Water Jordan Ministry of Water & Irrigation - Water Authority of Jordan 2019 Completed
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P3 Water Jordan Ministry of Water & Irrigation - Water Authority of Jordan 2019 Completed
Water Transmission Pipeline from Khaw PS to Za'atry PS Water Zarqa Ministry of Water & Irrigation - Water Authority of Jordan 2018 Completed
Rehabilitation of Yadoudeh DZ- 33 Water Amman Jordan Water Company (Miyahuna) 2018 Completed
Contract 5: Zarqa High and Batrawi East Water Networks Restructuring and Rehabilitation Water Zarqa Ministry of Water & Irrigation - Water Authority of Jordan 2016 Completed
Wastewater Treatment Plant and Effluent Reuse Facilities (C-1) Extra Works (Optional Items Water Al-Mafraq Ministry of Water & Irrigation - Water Authority of Jordan 2016 Completed
Reuse of Treated Wastewater for Irrigation Purposes in the Northern Jordan Valley - Package 3 Water Northern Jordan Valley Ministry of Water & Irrigation - Water Authority of Jordan 2016 Completed
Upgrade of Mafraq Wastewater Treatment Plant - Reuse System Water Mafraq Ministry of Water & Irrigation - Water Authority of Jordan 2016 Completed
Contract 3: Russaifah Low Water Networks Restructuring and Rehabilitation Water Zarqa Ministry of Water & Irrigation - Water Authority of Jordan 2015 Completed
Water Supply Network Project in Za’atari Camp – Phase 1 Water Zaatari Camp ACTED 2015 Completed
Installation of House Connections - Jordan Water Company (Miyahuna) Project Water Amman Jordan Water Company (Miyahuna) 2015 Completed
Disi Mudawara to Amman Water Conveyance System (35) Water Al Mudawara Disi Water Company (MWI & GAMA Enerji) 2013 Completed
Disi Mudawara to Amman Water Conveyance System (36) Water Al Mudawara Disi Water Company (MWI &GAMA Enerji) 2013 Completed
AL-Alamiyyeh Sewer Project Aqaba Water Company 2013 Completed
Galleria Mall – Skelton Works Buildings Amman Al Yaqout forReal Estate& Development 2012 Completed
Saden Complex Buildings Amman Al Asbat Al Aqaria 2012 Completed
Infrastructure and Landscape – Jordan-German University Infrastructure Madaba Jordan- German University 2010 Completed
Street Rehabilitation, Furnishing, Landscaping and Building Surveys for the Historic City of Jarash Infrastructure Jarash Ministry of Tourism 2010 Completed
Zaki Al Goul Project Buildings Amman Mr. Zaki Al Goul 2010 Completed
Saceb & Remon WasteWater Water Jarash Ministry of Water & Irrigation - Water Authority of Jordan 2009 Completed
Wastewater Collection Systems for South East Irbid Water Irbid Ministry of Water & Irrigation - Water Authority of Jordan 2009 Completed
Emmar Towers Buildings Amman Emmar for Land development & investment 2008 Completed
Jordan National Financial Center Project-Excavation Excavation Amman Jordan Securities Commission 2008 Completed
Saied Khair Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2008 Completed
South Amman Gate Exchange -Jerash Roads, Bridges & Tunnels Jarash Ministry of Tourism & Antiquities 2007 Completed
Ain Al-Basha Intersection Roads, Bridges & Tunnels Amman Ministry of Public Works & Housing 2007 Completed
Construction of Madaba / Na'or / Um-Al'amad Road Roads, Bridges & Tunnels Madaba Ministry of Public Works & Housing 2007 Completed
Abdoun Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2006 Completed
Zara Maeen Water Project Water Zara Maen Ministry of Water & Irrigation - Water Authority of Jordan 2006 Completed
Arab Bank Central Operation Unit – COU Project Buildings Amman Arab Bank plc. 2005 Completed
Construction of North Abu-Nusair Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2004 Completed
Construction of Jubaiha Entertainment Intersection Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2004 Completed
Rehabilitation of Greater Amman Water Network (Contract 4) Water Amman Ministry of Water & Irrigation - Water Authority of Jordan 2004 Completed
Construction of Bacalorea Intersection Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2004 Completed
Mu’tah University Sewage Treatment Plant Stage II Water Karak Mu’tah University Campus 2003 Completed
Restructuring of Greater Amman Water Supply System - Contract-2 Water Amman Ministry of Water & Irrigation - Water Authority of Jordan 2002 Completed
Re-Establishment of Water Supply to the Capital of Amman Water Amman Ministry of Water & Irrigation - Water Authority of Jordan 2002 Completed
Al-Hussein Cultural Center Buildings Amman Greater Amman Municipality 2002 Completed
Construction of Wadi Mousa Bridge Roads, Bridges & Tunnels Wadi Mousa Ministry of Public Works & Housing 2001 Completed
Queen Alia Street Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2001 Completed
Kafrain Water Supply Project Water Kafrain Ministry of Water & Irrigation - Water Authority of Jordan 2001 Completed
Construction of Army Street- South Hashmi Car Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 1999 Completed
Infrastructure of Abu-Nusair Housing Project Infrastructure Amman Ministry of Public Works & Housing 1999 Completed
North-East Irbid Waste Water Pumping Station Project Water Irbid Ministry of Water & Irrigation - Water Authority of Jordan 1999 Completed
Jaber Waste Water Treatment Plant Water Syrian Border Ministry of Water & Irrigation - Water Authority of Jordan 1999 Completed
Kafrain - Dead Sea Water Pipeline Project Water Dead Sea Jordan Valley Authority 1999 Completed
Faculty of Educational Science Buildings Amman University of Jordan 1995 Completed
Establishment and development of the Public Security Officers Club Buildings Amman Public Security Directorate 1992 Completed
Operation and maintenance of a wastewater purification plant in the Swaqa Repair and Rehabilitation Center Water Amman Public Security Directorate 1992 Completed
Operation and maintenance of a wastewater purification plant in the Umm Lulu Repair and Rehabilitation Center Water Ajloun Public Security Directorate 1992 Completed
Center for National Security and Crisis Management Buildings Public Security Directorate 2026 Completed
Work with us

Have a project in mind?

Get in Touch