Water
2024
Hallabat Well Field Transmission Pipeline
Seven decades of first-grade engineering across every discipline in Jordan.
Landmark projects spanning Jordan's most demanding engineering disciplines — seven decades of excellence.
Water
2024
Buildings
2024
Buildings
2024
Industrial
2023
Water
2023
Electromechanical
2021
Electromechanical
2021
Water
2016
Infrastructure
2013
No projects match your search.
Water
Buildings
Buildings
Industrial
Water
Buildings
Industrial
Electromechanical
Electromechanical
Buildings
Buildings
Water
Water
Electromechanical
Water
Buildings
Water
Water
Buildings
Water
Water
Water
Water
Water
Water
Water
Buildings
Infrastructure
Electromechanical
Water
Buildings
Buildings
Roads, Bridges & Tunnels
Water
Water
Roads, Bridges & Tunnels
Roads, Bridges & Tunnels
Roads, Bridges & Tunnels
Roads, Bridges & Tunnels
Buildings
Roads, Bridges & Tunnels
Water
Water
Buildings
Buildings
Buildings
Buildings
Roads, Bridges & Tunnels
Water
Water
Buildings
Buildings
Roads, Bridges & Tunnels
Water
Buildings
Buildings
Water No additional entries match this filter.
| Project | Type | Location | Client | Year | Status |
|---|---|---|---|---|---|
| Upgrade Khaw Abu-Alanda phase (II) | Water | Amman | Jordan Water Company (Miyahuna) | 2026 | Completed |
| Supply, Install, and Commission Pressure Management System | Water | Amman | Jordan Water Company (Miyahuna) | 2026 | Completed |
| Upgrade Khaw Pump Station | Water | Zarqa | Jordan Water Company (Miyahuna) | 2026 | Completed |
| SJFMEIAMC Healthcare and Educational Project – Package 02 – Enabling, Excavation and Skeleton Works. | Buildings | Amman | Saudi Jordanian Fund for Medical and Educational Investments and Asset Management Company | 2025 | Completed |
| ممستشفى المملكة التابع لشركة الصندوق السعودي الاردني للاستثمارات الطبية والتعليمية وادارة الاصول – الحزمة الثانية: أعمال الحفريات والهيكل الانشائي | Buildings | Amman | شركة الصندوق السعودي الاردني للاستثمارات الطبية والتعليمية وادارة الاصول | 2025 | Completed |
| Complementary Work for Network Rehabilitation of As-Salt Downtown (Naqab Swada) | Water | Salt | Ministry of Water & Irrigation - Water Authority of Jordan | 2025 | Completed |
| South Amman WWTP RAW Wastewater Storage Pond and Additional Diversion Chambers Works | Water | Amman | Jordan Water Company (Miyahuna) | 2024 | Completed |
| اعمال مبنى الادارة العامة الجديد وتحديث مبنى الادارة القائم - بنك المؤسسة العربية المصرفية (الاردن) | Buildings | Amman | بنك المؤسسة العربية المصرفية | 2023 | Completed |
| Driving Training Project | Roads, Bridges & Tunnels | Amman | KASOTC | 2023 | Completed |
| انشاء وتنفيذ ميادين قيادة الاليات | Roads, Bridges & Tunnels | Amman | شركة كاسوتك لتدريب العملبات الخاصة | 2023 | Completed |
| Water Sector Infrastructure Project (WSIP) /Amman Improvement Phase III/ Package (2): Miscellaneous Water Networks in Amman | Water | Amman | Ministry of Water & Irrigation - Water Authority of Jordan | 2023 | Completed |
| توريد وتمديد خط 600 ملم ستيل في شارع المطار عند كازية بلازا | Water | Amman | Jordan Water Company (Miyahuna) | 2022 | Completed |
| Construction of Tafileh Wastewater Treatment Plant | Water | Tafileh | Ministry of Water & Irrigation - Water Authority of Jordan | 2022 | Completed |
| Restructuring & Rehabilitation of DZ-28, Water Supply Network | Water | Amman | Jordan Water Company (Miyahuna) | 2021 | Completed |
| Restructuring & Rehabilitation of DZ-04, DZ-05, DZ-18, Water Supply Network | Water | Amman | Jordan Water Company (Miyahuna) | 2021 | Completed |
| Construction of Amman Bus Rapid Transit (BRT) Project - Package 8 and 9B (Omar Matar Street) and Package 9A (Fountain Square Terminal Station) | Roads, Bridges & Tunnels | Amman | Greater Amman Municipality | 2021 | Completed |
| تنفيذ المبنى الاداري واللوجيستي في الرويشد | Buildings | الرويشد | الوكالة الفرنسية للخبرة الفنية الدولية | 2021 | Completed |
| Bridge 4 Rehabilitation Works – Sweimwh – Zara Road /Dead Sea | Roads, Bridges & Tunnels | Dead Sea | Ministry of Public Works & Housing | 2020 | Completed |
| Extension & Rehabilitation of Wastewater Collection System in Mafraq City | Water | Mafraq | Ministry of Water & Irrigation - Water Authority of Jordan | 2019 | Completed |
| اعادة تاهيل شبكات المياه في منطقة اليادودة | Water | Amman | شركة مياه الاردن - مياهنا | 2018 | Completed |
| Construction of East Jerash Wastewater Treatment Plant | Water | Jarash | Ministry of Water & Irrigation - Water Authority of Jordan | 2018 | Completed |
| Contract 6: Construction of Basateen Pump Station and Reservoir | Water | Basateen | Ministry of Water & Irrigation - Water Authority of Jordan | 2016 | Completed |
| Wastewater Treatment Plant and Effluent Reuse Facilities (C-1) Extra Works (Optional Items | Water | Al-Mafraq | Ministry of Water & Irrigation - Water Authority of Jordan | 2016 | Completed |
| محطة تنقية الشلالة (الأعمال الإضافية) | Wastewater | Irbid | وزارة المياه والري - سلطة المياه | 2016 | Completed |
| Water Supply Network Project in Za’atari Camp – Phase 1 | Water | Zaatari Camp | ACTED | 2015 | Completed |
| تمديد شبكات المياه في مخيم الزعتري – المرحلة الاولى | Water | الزعتري | وكالة التعاون التقني والتنمية ACTED | 2015 | Completed |
| Installation of House Connections - Jordan Water Company (Miyahuna) Project | Water | Amman | Jordan Water Company (Miyahuna) | 2015 | Completed |
| مشروع سمارة للشقق: مباني سكنية ومول تجاري ونماذج فلل وبرك سباحة و محطة معالجة مياه الصرف الصحي | Buildings | غور الصافي | شركة البحر الميت للاستثمارات السياحية والعقارية | 2013 | Completed |
| المرحلة الاولى – مرسى زايد | Infrastructure | Aqaba | شركة المعبر للاستثمار | 2013 | Completed |
| مشروع جاليريا مول / أعمال الكهروميكانيك | Electromechanical | Amman | شركة الياقوات العقارية | 2013 | Completed |
| AL-Alamiyyeh Sewer Project | — | — | Aqaba Water Company | 2013 | Completed |
| مشروع العالمية للصرف الصحي | Wastewater | Aqaba | شركة مياه الاردن - مياهنا | 2013 | Completed |
| جاليريا مول - أعمال الهيكل | Buildings | Amman | شركة الياقوات العقارية | 2012 | Completed |
| مشروع سمارة البحر الميت: منتجع سمارة البحر الميت، مباني F,E,D والبنية التحتية | Buildings | غور الصافي | شركة البحر الميت للاستثمارات السياحية والعقارية | 2012 | Completed |
| Saden Complex | Buildings | Amman | Al Asbat Al Aqaria | 2012 | Completed |
| مجمع سادن | Buildings | Amman | الاسباط العقارية | 2012 | Completed |
| Shmeissani – Abdali Interchange | Roads, Bridges & Tunnels | Amman | Greater Amman Municipality | 2012 | Completed |
| Infrastructure and Landscape – Jordan-German University | Infrastructure | Madaba | Jordan- German University | 2010 | Completed |
| Street Rehabilitation, Furnishing, Landscaping and Building Surveys for the Historic City of Jarash | Infrastructure | Jarash | Ministry of Tourism | 2010 | Completed |
| إعادة تأهيل الشوارع والبنية التحتية والساحات العامة في وسط مدينة جرش | Infrastructure | Jarash | وزارة السياحة والاثار | 2010 | Completed |
| نظام التزويد بمياه منطقة الحميمة | Water | Aqaba | شركة مياه العقبة | 2010 | Completed |
| Zaki Al Goul Project | Buildings | Amman | Mr. Zaki Al Goul | 2010 | Completed |
| مشروع زكي الغول | Buildings | Amman | السيد زكي الغول | 2010 | Completed |
| Saceb & Remon WasteWater | Water | Jarash | Ministry of Water & Irrigation - Water Authority of Jordan | 2009 | Completed |
| Wastewater Collection Systems for South East Irbid | Water | Irbid | Ministry of Water & Irrigation - Water Authority of Jordan | 2009 | Completed |
| Emmar Towers | Buildings | Amman | Emmar for Land development & investment | 2008 | Completed |
| أبراج إعمار | Buildings | Amman | شركة إعمار للتطوير والاستثمار العقاري | 2008 | Completed |
| Jordan National Financial Center Project-Excavation | Excavation | Amman | Jordan Securities Commission | 2008 | Completed |
| Saied Khair Tunnel | Roads, Bridges & Tunnels | Amman | Greater Amman Municipality | 2008 | Completed |
| South Amman Gate Exchange -Jerash | Roads, Bridges & Tunnels | Jarash | Ministry of Tourism & Antiquities | 2007 | Completed |
| بوابه جنوب عمان / جرش | Roads, Bridges & Tunnels | Jarash | وزارة السياحة والاثار | 2007 | Completed |
| Ain Al-Basha Intersection | Roads, Bridges & Tunnels | Amman | Ministry of Public Works & Housing | 2007 | Completed |
| مشروع تقاطع الشورى والطباع | Roads, Bridges & Tunnels | Amman | امانة عمان الكبرى | 2007 | Completed |
| Zara Maeen Water Project | Water | Zara Maen | Ministry of Water & Irrigation - Water Authority of Jordan | 2006 | Completed |
| مياه وادي ماعين والزارا والموجب | Water | زارا ماعين | وزارة المياه والري - سلطة المياه | 2006 | Completed |
| Arab Bank Central Operation Unit – COU Project | Buildings | Amman | Arab Bank plc. | 2005 | Completed |
| مبنى البنك العربي- طريق المطار | Buildings | Amman | البنك العربي | 2005 | Completed |
| Construction of North Abu-Nusair Tunnel | Roads, Bridges & Tunnels | Amman | Greater Amman Municipality | 2004 | Completed |
| Construction of Jubaiha Entertainment Intersection Tunnel | Roads, Bridges & Tunnels | Amman | Greater Amman Municipality | 2004 | Completed |
| Rehabilitation of Greater Amman Water Network (Contract 4) | Water | Amman | Ministry of Water & Irrigation - Water Authority of Jordan | 2004 | Completed |
| Mu’tah University Sewage Treatment Plant Stage II | Water | Karak | Mu’tah University Campus | 2003 | Completed |
| Re-Establishment of Water Supply to the Capital of Amman | Water | Amman | Ministry of Water & Irrigation - Water Authority of Jordan | 2002 | Completed |
| إعادة إنشاء نظام تزويد العاصمة عمان بالمياه | Water | Amman | وزارة المياه والري - سلطة المياه | 2002 | Completed |
| Al-Hussein Cultural Center | Buildings | Amman | Greater Amman Municipality | 2002 | Completed |
| إعادة تأهيل ضريح النبي شعيب | Buildings | السلط | اللجنة الملكية لاعمار مقامات الانبياء والصحابة | 2002 | Completed |
| مركز الحسين الثقافي | Buildings | Amman | امانة عمان الكبرى | 2002 | Completed |
| Construction of Wadi Mousa Bridge | Roads, Bridges & Tunnels | Wadi Mousa | Ministry of Public Works & Housing | 2001 | Completed |
| Queen Alia Street Tunnel | Roads, Bridges & Tunnels | Amman | Greater Amman Municipality | 2001 | Completed |
| إنشاء نفق على تقاطع شارع الملكة علياء (نفق السيفوي) | Roads, Bridges & Tunnels | Amman | امانة عمان الكبرى | 2001 | Completed |
| Kafrain Water Supply Project | Water | Kafrain | Ministry of Water & Irrigation - Water Authority of Jordan | 2001 | Completed |
| Construction of Army Street- South Hashmi Car Tunnel | Roads, Bridges & Tunnels | Amman | Greater Amman Municipality | 1999 | Completed |
| إنشاء نفق الهاشمي الجنوبي | Roads, Bridges & Tunnels | Amman | امانة عمان الكبرى | 1999 | Completed |
| إنشاء مبنى اللوازم والمستودعات والمشاغل /وزارة الصحة | Buildings | Zarqa | وزارة الاشغال العامة والاسكان | 1999 | Completed |
| Infrastructure of Abu-Nusair Housing Project | Infrastructure | Amman | Ministry of Public Works & Housing | 1999 | Completed |
| North-East Irbid Waste Water Pumping Station Project | Water | Irbid | Ministry of Water & Irrigation - Water Authority of Jordan | 1999 | Completed |
| Jaber Waste Water Treatment Plant | Water | Syrian Border | Ministry of Water & Irrigation - Water Authority of Jordan | 1999 | Completed |
| مشروع محطة جابر لمعالجة المياه العادمة | Wastewater | الحدود السورية | وزارة المياه والري - سلطة المياه | 1999 | Completed |
| نفق تقاطع الشهيد | Roads, Bridges & Tunnels | Amman | امانة عمان الكبرى | 1999 | Completed |
| قاعدة موفق السلطي الجوية (F16) | Buildings | المفرق | سلاح الجو الملكي الأردني | 1998 | Completed |
| توسعة فندق الانتركونتيننتال | Buildings | Amman | شركة زارة للاستثمار القابضة | 1998 | Completed |
| إنشاء نفقين على تقاطع الملك طلال (الدوار الثالث) | Roads, Bridges & Tunnels | Amman | امانة عمان الكبرى | 1997 | Completed |
| إنشاء كلية العلوم التربوية في الجامعة الأردنية | Buildings | Amman | الجامعة الاردنية | 1995 | Completed |
| Establishment and development of the Public Security Officers Club | Buildings | Amman | Public Security Directorate | 1992 | Completed |
| Operation and maintenance of a wastewater purification plant in the Swaqa Repair and Rehabilitation Center | Water | Amman | Public Security Directorate | 1992 | Completed |
| Operation and maintenance of a wastewater purification plant in the Umm Lulu Repair and Rehabilitation Center | Water | Ajloun | Public Security Directorate | 1992 | Completed |
| Center for National Security and Crisis Management | Buildings | — | Public Security Directorate | 2026 | Completed |