- The project comprises the construction of wastewater collection systems to serve Dogara & Natifa communities with a total collect ring length of approximately 19 Km for Dogara Region & 21.5 Km for Natifa region.
- Collection lines sizes ranging from 200mm diameter up to 300mm diameter gravity mains. The contract also includes about 2.4 Km & 1.5 Km house connection laterals of 150mm diameter to serve Dogara & Natifa communities respectively.
- The Project also includes the construction of 1.3 Km of 150mm diameter Ductile Iron force main in Dogara, starting from a new pump station, which will be constructed at Dogara village.
- The communities Natifa & Dogara connected to the existing network and discharge their wastewater to the existing "Wadi Al-Arab treatment plant". - The Project also includes the construction of a pump station at Dogara area including the construction of reservoir and a service building.