Wastewater Collection Systems for IRBID South East

The project comprises the construction of wastewater collection systems including House Connection lateral to serve part of Irbid South-East community with a total collector length of approximately 33.38 Km ranging in size from 200mm diameter up to 500mm diameter Gravity mains with approximately 5.48 Km of 150mm diameter house connection.

employer
Water Authority
consultant
Fichtner /BBV/PFI/CC
sector
Water Projects
Location
jordan /Irbid