The Contractor scope of work is excavation, pipe laying, Installing, Bacterial testing & Sterilization of the main and sub main water pipelines of the reinstatement. The Pipelines will be Ductile Iron of different types with 4” diameter and up to 500 m length. The contractor scope of work including House Connections and the operation of the pipelines and water meters.